ISO/ASTM 52901

ISO/ASTM 52901 is the standard that lists what a buyer and a part provider exchange when additive manufactured parts are ordered.

Every ISO/ASTM 52901 article of the 3D Printing Resources, newest first, each written from published standards, research and makers’ data.

Meaning

ISO/ASTM 52901 is the standard that lists what a buyer and a part provider exchange when additive manufactured parts are ordered. It was published on 20 July 2017 under ISO technical committee 261 and confirmed at its last review on 11 April 2023. Its scope names order information, part definition data, feedstock requirements, final part characteristics, inspection requirements and part acceptance methods. It sets minimum acceptance requirements and lets an order add stricter ones as supplementary requirements.

Structure

The document runs to 11 pages and 23 numbered subclauses, and its contents page reads like the headings of a purchase order. Clause 4.2 holds part ordering information. Clause 4.3 defines the part, with headings for geometry, tolerances, surface texture, process, feedstock, repair methods, acceptable imperfections and process control information. It ends with authorized outside service providers. Clause 4.4 covers characteristics, functionality, inspection, post-processing and other requirements. Annex A, informative, gives the typical content of a purchase order on page 9.
Read More

Order Values

The standard lists items and sets no number for any of them. Tolerance values, property values, test methods, the orientation convention and the reporting format all stay with the buyer. Datasheets give ranges to start from. The Formlabs guide gives ±0.5 % or 0.3 mm (0.012 in) for selective laser sintering (SLS) and Multi Jet Fusion (MJF). An EOS sheet gives a typical accuracy of about ±20 to 50 µm (±0.0008 to 0.002 in) for small 316L parts. Citing the standard without values fixes the headings of an order and none of its limits.

Process Control Line

Clause 4.3.9 names process control information, and the EOS 316L sheet shows why it earns a line. The same powder has 4 parameter sets with different layer thicknesses, volume rates and dimensional changes after heat treatment. The change is +0.02 % on the 20 µm set and +0.2 % on the 40 µm set. Naming the set, such as 316L_Surface or 316L_040_FlexM291, fixes which figures the supplier holds to. A later change of set then counts as a change to the order. An order can place the unpacking temperature of a nylon build, or the wash and cure record of a resin part, under the same heading.

Inspection Stage

Inspection and post-processing carry most of the risk in clause 4.4, because both can change a figure that clause 4.3 fixed. A heat treatment changes size. On the EOS sheet, shot peening lowers a 316L surface from Ra 13 µm (512 µin) to Ra 5 µm (197 µin). Polishing takes it below Rz 1 µm (39 µin). A post-cure shrinks a resin part, as the Formlabs tolerance guide states. An order that names the inspection without the stage of measurement leaves the supplier free to measure before or after any of these steps. Writing “after heat treatment and finishing” removes that choice. Where a property cannot be measured on the part, the order says how many witness specimens are printed, in which orientation and to which method.

Acceptance Stages

Clause 4.5 divides acceptance into general, qualification parts, the first production part, the final or reference part and the documentation of acceptance. The stages set the order in which a series is released. In a worked case with assumed numbers, 600 parts arrive in 6 lots of 100. Lots 2 to 6 are compared with a reference part kept from lot 1 and with witness specimens from each build. Without a common reference, an assumed drift of 0.1 % per lot compounds to 0.5 % by lot 6. That is the full SLS and MJF band of ±0.5 % used in one direction.

Sibling Standards

Four documents of the same family fill what this one leaves open. ISO/ASTM 52900 supplies the vocabulary for naming the process. ISO/ASTM 52921 and ASTM F2971 cover coordinate systems, orientation and the reporting of specimen data. ISO/ASTM 52927 links the characteristics of feedstock and parts to their test methods. An order cites 52901 by edition, ISO/ASTM 52901:2017, and fills the headings of clauses 4.2 to 4.5 with a value or the words “not applicable”. The clause text sits behind the standard’s paywall, so the purchased copy is read before the wording of any clause is relied on.

How Many Parts Fit in One SLS or MJF Build

Chamber volume times packing density divided by part volume sets the count, and every term has a published limit.

How Many Parts Fit in a Powder Bed Fusion BuildPowder bed fusion, one of the seven process categories in ISO/ASTM 52900, builds parts inside a bed of powder that supports them, so a chamber can be filled in three dimensions and the parts need no support structures. The count that results is set by three quantities: the usable volume, the share of that volume that holds parts, and the volume of the part itself.

Inspecting a 3D Printed Production Run and When a Mold Takes Over

Accept the first printed part against written limits, keep the record, and weigh a mold by identical quantity and design stability.

How a Printed Production Run Is Inspected and AcceptedISO/ASTM 52901:2017, titled requirements for purchased AM parts, gives the frame. Its scope says it covers the elements to be exchanged between customer and part provider at the time of the order: customer order information, part definition data, feedstock requirements, final part characteristics and properties, inspection requirements and part acceptance methods.

How Long a Batch of 3D Printed Parts Takes From Print to Pack-Out

A printed batch runs on four clocks, build, cooldown, finishing and inspection, and a stated lead time should show each.

Lead Time for a 3D Printed Batch Stage by StageThe calendar of a batch has the same skeleton in every process. Files are prepared and nested, the machine builds, the work cools or cures, parts are separated from what held them, and finishing and inspection follow.

SLA Wash and Post-Cure Step by Step From Green Part to Finished Resin Part

Wash each resin for its own time, dry it fully, cure to the datasheet condition, then remove supports and measure.

SLA Wash, Dry, Cure and Support Removal in OrderThe part leaves the printer in a green state: polymerized enough to keep its shape, but with its reaction unfinished and a film of liquid resin over it. The order in which the finishing steps run is set by what each one needs from the one before.

Metal 3D Printing Stress Relief and Build Plate Removal Step by Step

Stress relieve metal parts on the plate, then cut, remove supports, anneal if needed and measure after the heat.

Metal Powder Bed Fusion Post-Build Steps in OrderThe post-build sequence for a part built on a plate has a stable shape across machine makers, because the stresses behave the same way. The sources agree on the order; they differ in how much of the detail they publish.

SLS Nylon 12 Dimensional Tolerance in XY and Z

Laser sintered nylon holds far tighter size in the layer plane than across the layers, so a drawing writes the axes apart and states build position, scaling and measured data.

SLS Nylon 12 Tolerance in XY and in ZTable 1 lists the statements, then applies them to sizes a designer uses. The guide gives the XY rule for SLS and MJF as ±0.5 % or 0.3 mm, whichever is larger.

SLA Dimensional Tolerance by Feature Size

SLA tolerance is published as a percentage of feature size with a small floor, so a drawing writes bands and a post-cure condition and not one general figure.

SLA Tolerance Values Published by Two MakersTable 1 states the two specifications as their makers print them. Neither is a guarantee for a delivered part, and the Formlabs guide notes that the best way to judge a printer is to inspect real parts.

ISO/ASTM 52901 Requirements for Purchased Additive Manufactured Parts

The purchased parts standard lists what an additive parts order carries, from tolerances and feedstock to three acceptance stages, and leaves every value to the buyer.

What ISO/ASTM 52901 Asks a Buyer and a Supplier to ExchangeThe scope has three sentences and each one shapes how the standard is used. The first says the document defines and specifies requirements for purchased parts made by additive manufacturing.

ISO/ASTM 52900 Additive Manufacturing Terms and the Seven Process Categories

The vocabulary standard fixes the words an additive order is written in, so name the process category beside the brand and let other standards set quality.

What ISO/ASTM 52900 Covers and What It Leaves OutISO/ASTM 52900 establishes and defines the terms used in additive manufacturing (AM), the technology that applies an additive shaping principle and builds physical three-dimensional geometries by successive addition of material. Its scope sentence also states that the terms are classified into specific fields of application.

Send the 3D File of Your Printed Part

Send the 2D drawing and the 3D file, with the quantity and the stage of the project. An engineer replies within 1 working day.

The quote form, the mutual NDA and the private folder for your files are on Protolis Atelier, with 3D Printing chosen.

Request a Quote