ISO/ASTM 52901 Requirements for Purchased Additive Manufactured Parts

The purchased parts standard lists what an additive parts order carries, from tolerances and feedstock to three acceptance stages, and leaves every value to the buyer.

3D printed dark grey nylon parts set out in neat rows on a plain inspection tray, one part turned over.

Eleven pages and twenty-three numbered subclauses: that is the whole of ISO/ASTM 52901, the standard a buyer reaches for when the question is not how a printer works but what an order for printed parts has to say. The contents page reads like the paragraph headings of a purchase order, which is what it is meant to be. Part ordering information, tolerances, surface texture, feedstock, repair, acceptable imperfections, process control, outside service providers, inspection, post-processing, and three separate acceptance stages for qualification parts, the first production part and the final or reference part.

The standard is published by ISO and ASTM International, was issued on 20 July 2017 under ISO technical committee 261, and was confirmed at its last review on 11 April 2023 (stage 90.93). This piece reads it as a buyer’s checklist. It states what the scope and the contents page establish, shows which datasheet figures from these resources fill each heading, and marks the places where a buyer has to read the full text before relying on a clause.

What ISO/ASTM 52901 Asks a Buyer and a Supplier to Exchange

The scope has three sentences and each one shapes how the standard is used. The first says the document defines and specifies requirements for purchased parts made by additive manufacturing. The second says it gives guidelines for the elements exchanged between the customer and the part provider at the time of the order: the customer order information, the part definition data, the feedstock requirements, the final part characteristics and properties, the inspection requirements and the part acceptance methods. The third says the document applies as a basis for obtaining parts that meet minimum acceptance requirements, and that more stringent requirements can be added as supplementary requirements at the time of the order.

Two things follow from that wording.

  • The standard sets a floor for the conversation, not a performance level for the part. It tells you which items an order should carry. It does not tell you a number for any of them.
  • Anything beyond the minimum belongs in the order as a supplementary requirement. A buyer who needs tighter control of powder, process or inspection writes it in, and the standard gives the place to write it.

ISO/ASTM 52901 is a list of what an order says, and the order supplies the numbers. A buyer who cites it and writes no values has bought the format and nothing else.

Its sibling documents fill in the numbers. ISO/ASTM 52900 supplies the vocabulary, ISO/ASTM 52927 the test methods and ISO/ASTM 52921 the coordinate systems, and the last section shows how the four are used together.

Part Ordering Information and the Definition of the Part

Clauses 4.1 to 4.3 are the order proper. Table 1 lists each heading from the contents page and sets beside it the values that sources in these resources give for that heading. The right-hand column is the writer’s suggestion of what to fill in, with the figures taken from the data sheets read for these resources.

Table 1. Order and part definition headings of ISO/ASTM 52901 (clauses 4.2 and 4.3), with example values from datasheets
Clause Heading What the order fills in Example value from these resources’ sources
4.2 Part ordering information part number, revision, quantity, delivery, contacts not a datasheet item
4.3.2 Part geometry 3D model, drawing, datum scheme, build direction when it matters build direction decides elongation: 18 % in the layer plane and 4 % across it on the EOS PA 2200 sheet
4.3.3 Tolerances tolerance by feature and size band, with a floor SLS and MJF: ±0.5 % or 0.3 mm, whichever is larger (Formlabs); SLA: ±0.15 % for 1 to 30 mm with a ±0.02 mm floor; 316L laser powder bed: ±20 to 50 µm small parts, about 0.2 % large parts (EOS)
4.3.4 Surface texture roughness value, its measure and the surfaces it applies to 316L as built Ra 13 ± 5 µm (0.5 ± 0.2 × 10⁻³ in), shot-peened Ra 5 ± 2 µm (EOS)
4.3.5 Part manufacturing process the process category and machine family powder bed fusion, argon atmosphere, 20 µm layers
4.3.6 Feedstock for the part powder or resin grade, refresh or lot rule HP HR PA 12 at a 20 % refresh rate; glass bead grade at a 30 % minimum refresh
4.3.7 Repair methods which repairs are allowed, if any the clause heading only; the order states the allowed methods
4.3.8 Acceptable imperfection(s) or non-conformance what counts as acceptable and what does not average defect percentage 0.018 % (45 samples, 20 µm set); 0.1 % at 40 µm Core (EOS)
4.3.9 Process control information parameter set, software version, build log parameter set names such as 316L_Surface and 316L_040_FlexM291 (EOS)
4.3.10 Authorized outside service providers who may heat treat, machine, coat or inspect the clause heading only

Sources: contents page and scope of ISO/ASTM 52901:2017 (Genorma catalog page and the publisher’s preview of the contents); EOS, HP and Formlabs datasheets as listed at the end.

The right-hand column is a reading aid, and a buyer should not take it as the standard’s own content. The catalog page and the preview PDF publish the scope and the contents only. The text of each clause is behind the standard’s paywall, so the table makes no claim about what a clause says beyond its heading.

Why Process Control Information Sits in the Order

Clause 4.3.9 names process control information. For a metal powder bed the sheet from EOS shows why the heading is worth a line. The same 316L powder has four parameter sets, each with a different layer thickness, a different volume rate and a different dimensional change after heat treatment: +0.02 % for the 20 µm Surface set and +0.2 % for the 40 µm set. Naming the set fixes which of those the supplier holds to, and a later change of set then counts as a change to the order.

Part Characteristics, Inspection and Post-Processing

Clause 4.4 moves from what the part is to how it is shown to be that. Table 2 sets out its six headings with the corresponding test or figure from the datasheets.

Table 2. Characteristics, functionality and performance headings of ISO/ASTM 52901 (clause 4.4), with example conditions
Clause Heading What the order fills in Example from these resources’ sources
4.4.2 Part characteristics the properties the part has to carry 316L density at least 7.97 g/cm³ (ISO 3369); yield 480 MPa (69.6 ksi) vertical, 540 MPa (78.3 ksi) horizontal (ISO 6892-1)
4.4.3 Functionality the function the part has to perform a snap fit that flexes at assembly; a load that has a direction
4.4.4 Inspection method, sampling, specimens witness specimens from the same build, tested per ISO 527 or ASTM D638, in a stated orientation
4.4.5 Post-processing the steps applied and their parameters stress relief 900 °C for at least 2 h; solution anneal 1,150 °C for at least 1.5 h (EOS)
4.4.6 Other requirements marking, packaging, certificates declarations of the part’s maker for any regulated use

Sources: contents of ISO/ASTM 52901:2017; EOS 316L and PA 2200 datasheets; HP datasheets.

Inspection and post-processing carry most of the risk in this clause, because both can change a figure that the earlier clauses fixed. A heat treatment changes size: the 316L sheet states a typical dimensional change after heat treatment of +0.02 % for one parameter set and +0.2 % for another, so a 100 mm dimension moves by 0.02 mm or 0.2 mm. A finishing step changes the surface: shot peening takes the 316L surface from Ra 13 ± 5 µm to Ra 5 ± 2 µm, and polishing takes Rz below 1 µm. A post-cure changes size and properties, since the Formlabs tolerance guide states that post-curing causes shrinkage in resin parts and its printer software compensates for it.

An order that lists the inspection step without naming the stage at which the part is measured leaves the supplier free to measure before or after any of these steps. Writing “after heat treatment and finishing” removes the ambiguity.

Specimens Printed With the Part

Where a property cannot be measured on the part itself, a printed specimen stands for it. The EOS 316L sheet reports its results from several hundred specimens per direction, 363 vertical and 246 horizontal on the first parameter set, and quotes tolerance intervals at three different confidence levels, T99, T95 and T90. If an order asks for tensile data from witness specimens, it should say how many, in which orientation and to which method, since the datasheet values are typical values from the maker’s validation and not an acceptance limit.

Qualification, First Production and Reference Part Acceptance

Clause 4.5 divides acceptance into five parts: general, acceptance of qualification parts, acceptance of the first production part, acceptance of the final or reference part, and documentation of acceptance. The structure matters more than the wording, because it sets the order in which a series is released.

Table 3. Acceptance stages in ISO/ASTM 52901 (clause 4.5) and what a buyer attaches to each
Clause Stage What the buyer decides Example condition
4.5.1 General the acceptance method and who signs named inspector, named document
4.5.2 Qualification parts whether the process is shown capable before the series witness specimens and trial parts from the chosen parameter set
4.5.3 First production part whether the first part of the series is held for approval the first part inspected on every drawing feature
4.5.4 Final or reference part which part stays as the reference for later lots one part retained and marked
4.5.5 Documentation of acceptance records kept, with their format inspection report, build log, specimen results

Source: contents of ISO/ASTM 52901:2017. The “example condition” column is a suggestion by the writer.

A worked case with assumed numbers shows why the stages are distinct. Take a series of 600 parts delivered in six lots of 100, each from its own build. The order calls for acceptance of the first production part at lot one, and for a retained reference part from that lot. Lots two to six are then compared with the reference part and with the witness specimens printed alongside each build. If the buyer only specifies an inspection of “all lots”, six builds go through with no common reference, and a drift in dimension of 0.1 % per lot (an assumed figure) compounds to 0.5 % by lot six, which is the full SLS and MJF band of ±0.5 % in one direction.

What the Standard Leaves to the Order

Because the standard lists items and sets no values, a number of important decisions stay with the buyer.

  • Tolerance values, which come from the process’s capability. The order states them, and the datasheets give ranges to start from.
  • Property values and their test methods, covered by ISO/ASTM 52927 and the maker’s data.
  • The orientation convention, covered by ISO/ASTM 52921, which standardizes terms for coordinate systems and the location and orientation of parts.
  • The reporting format for test data, covered by ASTM F2971, which provides a common format for presenting data for AM specimens.
  • Supplementary requirements. The scope allows more stringent requirements to be added at the time of the order, and the contents give no list of them. A buyer who wants a fixed refresh ratio, a named parameter set or a retained specimen from every build writes each one as its own line, so the supplier can answer yes or no to it.
  • Any regulated use. The EOS PA 2200 sheet states that the powder is not developed or certified as a medical device under Regulation (EU) 2017/745, and the 316L sheet lists medical devices among typical applications without a declaration. The ratings belong to the maker of the finished part.

A standard that lists order items can only be as strict as the numbers written under each heading.

Writing the Order From the Headings

Annex A of the standard, titled typical content of a purchase order, is informative. It sits at page 9 of the eleven and is the part of the document a buyer is most likely to copy from, with the caution that a typical content is a starting point and a part with a regulated use or a safety function needs more than the typical.

The approach that follows from the contents page is to open the order with the headings of 4.2 to 4.5 in the same order and fill each with a value or the words “not applicable”. A short sequence works for most printed parts.

  • Cite the standard by edition, ISO/ASTM 52901:2017, and say which clauses apply to the order.
  • Name the process category in the words of ISO/ASTM 52900, with the brand beside it.
  • Give the tolerance as a percentage with a floor, by size band, and the surface requirement as a roughness value with its measure.
  • Name the feedstock and the parameter set, and state the refresh or lot rule where the maker gives one.
  • State the post-processing steps and write whether dimensions apply before or after each.
  • Ask for qualification parts, first production part approval and a retained reference part, each as a separate line.

Once an order carries those lines, a buyer weighing low-volume 3D printing against a molded tool for bridge production can hold every lot to the same written conditions, and a changed supplier or machine shows up as a change to a named line.

Sources and Further Reading

Send the 3D File of Your Printed Part

Send the 2D drawing and the 3D file, with the quantity and the stage of the project. An engineer replies within 1 working day.

The quote form, the mutual NDA and the private folder for your files are on Protolis Atelier, with 3D Printing chosen.

Request a Quote