Meaning
The first production part is the first part of a series, inspected and approved before the rest of the run is built. ISO/ASTM 52901 gives its acceptance a clause of its own, 4.5.3, between qualification parts and the final or reference part. It is the part on which a wrong orientation, parameter set or post-processing step costs least to find. Once approved, it carries a documented geometry that later parts are compared against.Inspection Scope
The first production part is inspected on every drawing feature, by the method named for each. A resin part is measured after post-cure, a nylon part after unpacking at the agreed temperature and a metal part after heat treatment. The inspection report names the measuring method, the build position and the number of parts measured. On laser-sintered nylon, the report also gives any scale factor applied to the file.Read More
Place in the Series
In a worked case with assumed numbers, an order of 600 parts in 6 lots accepts the first production part at lot 1. A reference part from that lot then serves as the comparison for lots 2 to 6. Qualification parts and witness specimens from the chosen parameter set come before it and show the process capable. The documentation of acceptance, clause 4.5.5, records each stage.Lead Time
A first part approval places a pause between the first build and the rest. ISO/ASTM 52901 lists the first production part among the acceptance points of an order, beside part ordering, process control, post-processing and inspection. A lead time quoted against such an order shows when the first part is due and when the run resumes. On a nylon order, the count per build sits under the process heading and the approval under acceptance.Handover to a Mold
When a mold takes over a printed run, the approved first production part is the starting file. The move to molding is a change of process family, so the mold receives its own first-part approval. The dimensions that were hard to hold on the printed part are reviewed with the molder first. Features finished by hand are reviewed in the same pass.