Meaning
Acceptance is the buyer’s documented decision that delivered parts meet the order, made against limits and methods agreed beforehand. ISO/ASTM 52901 gives it clause 4.5, which has 5 parts. They are general, qualification parts, the first production part, the final or reference part and the documentation of acceptance. Stricter requirements than the standard’s minimum are added at the time of the order.Release Order
Qualification parts and witness specimens from the chosen parameter set show the process capable before the run. The first production part is inspected on every drawing feature and held for approval. A final or reference part is retained and marked as the comparison for later lots. The record of what was accepted, and when, closes the clause.Read More
First Part Timing
The first production part is accepted before the rest of the run is built. A wrong orientation or parameter set costs least when found on the first part. In a worked case with assumed numbers, 600 parts arrive in 6 lots of 100, each compared with the reference part from lot 1. An inspection of “all lots” without a common reference lets an assumed drift of 0.1 % per lot compound to 0.5 % by lot 6. That drift uses the full selective laser sintering (SLS) and Multi Jet Fusion (MJF) band of ±0.5 % in one direction.Acceptance Limits
Each dimension needs a limit, and a printed part’s limit depends on the process and the feature size. Formlabs publishes ±0.15 % for stereolithography (SLA) features of 1 to 30 mm (0.04 to 1.18 in), with a floor of ±0.02 mm (±0.0008 in). It gives ±0.5 % or 0.3 mm (0.012 in), whichever is larger, for SLS and MJF. A typical datasheet value is not an acceptance limit. The acceptance figure is written as a typical value or a lower bound, with its confidence level. A limit narrower than the process holds needs a step that delivers it, and the plan names that step.Acceptable Imperfections
Clause 4.3.8 names acceptable imperfections and non-conformance, meaning what a part may show and still pass. For printed 316L, EOS reports an average defect percentage of 0.018 % from 45 samples on its 20 µm set. That figure is a reference point for the line. Support marks on resin are a feature of the process, and the drawing says which faces may carry them. A metal part cut from its plate without stress relief can come out of flat beyond the drawing. That failure traces back to the order of steps, which the order can fix in writing.Documentation
Acceptance closes with a record of what was accepted and when, under clause 4.5.5. The record holds the inspection report, the build log and the specimen results, in a format the order names. A printed run’s record also lists the parts rejected and why. A mold maker starts from it when a tool takes over. The record costs little while the run is going and much more to rebuild later.