Post-Processing

Post-processing is every operation a printed part goes through between the end of the build and its inspection.

Every Post-Processing article of the 3D Printing Resources, newest first, each written from published standards, research and makers’ data.

Meaning

Post-processing is every operation a printed part goes through between the end of the build and its inspection. It covers cooling, depowdering, washing, curing, heat treatment, cutting from the plate, support removal, blasting, machining, sanding and finishing. ISO/ASTM 52901 lists post-processing as clause 4.4.5 of an order, under which the buyer states the steps and their parameters. Each step can change a size, a surface or a property that the build had fixed.

Sequence by Process

Each process family follows its own fixed order, set by what each step needs from the one before. A nylon build cools as a cake, is unpacked and sifted, then blasted, and dyeing or smoothing is applied to the clean parts. A resin part is washed, dried and cured, and only then freed of its supports, because parts can warp under light and heat without them. A metal part is stress relieved on its plate, cut free by bandsaw or wire erosion, cleared of supports by hand and blasted. Critical features are machined where the drawing calls for it.
Read More

Effect on Size

Several steps move a dimension after it was printed. Post-curing shrinks a resin part, and Formlabs print preparation software compensates for that shrinkage automatically. On the EOS 316L material data sheet, heat treatment changes a size by +0.02 % on the 20 µm set. It changes it by +0.2 % on the 40 µm set. Sanding changes the dimension it touches. In the Formlabs test, nylon parts unpacked above 70 °C (158 °F) warped consistently. A tolerance therefore states the stage at which it applies, and the inspection follows the last step that moves it.

Effect on Surface

Finishing steps change what a gauge reads on a face. EOS gives vertical faces of printed 316L as Ra 13 ± 5 µm (512 ± 197 µin). Shot peening brings them to Ra 5 ± 2 µm (197 ± 79 µin), and polishing to below Rz 1 µm (39 µin). Supports leave rough contact points on metal that are ground by hand, and marks on resin that are sanded dry or wet. A Fuse Blast cleans and blasts the parts of a Fuse X1 chamber in about 20 minutes.

Time and Labor

Post-processing runs on two clocks, waiting time per build and hands-on time per part. Formlabs states that a Fuse X1 build of 3,231 nylon parts cools for 32 hours. It then needs 20 to 25 minutes of active labor within 35 to 40 minutes. A resin batch of 3,000 parts has 3,000 sets of supports to cut. MakerVerse calls metal support removal time-consuming and labor-intensive. A 316L stress relief holds at least 2 hours at 900 °C (1,652 °F), and the furnace’s heating and cooling come on top.

Failure Mode

The faults of post-processing show on the bench or the measuring machine, not in the printer log. A resin part whose supports came off before post-cure can warp under light and heat. A tacky resin surface after drying points to solvent loaded with resin, an under-washed part or both. A stainless part whose quench was slower than the datasheet asks can lose corrosion resistance to chromium carbides. A 316L wall near the 0.3 to 0.4 mm (0.012 to 0.016 in) minimum has little margin against a chisel during support removal. A nylon part that rattles or a bore that refuses its gauge pin points to powder left in a cavity.

Post-Processing Record

The post-processing record is process control information under ISO/ASTM 52901, and a reorder depends on it. A different wash bath or oven in a second batch changes a resin part without changing the drawing. A metal order names heat treatment before plate removal, the cutting method, the support removal method and the faces that may carry marks. A nylon order names the unpacking temperature ceiling and the refresh ratio. An order can assign outside steps, such as heat treatment, machining or inspection, under the clause on authorized outside service providers.

3D Printing Defects in a Production Batch Traced to Their Cause

A defect in a printed batch is traced by its pattern, every part, one zone, one build or a slow trend across builds, and each pattern points to its own cause and evidence.

Reading a Defect by Its Pattern Across the BatchThe 2022 review sorts the sources of metal powder bed defects into three groups: defects transferred from the feedstock powder, defects formed in the interaction of the beam with powder and metal during melting, and defects created in post-processing such as heat treatment. It adds a fourth set of contributors around them: the equipment, powder handling and dispensing, and build preparation, meaning orientation and supports.

TPU Flexible Powder for SLS and MJF Parts

TPU from a powder bed is equally soft in every direction but stretches far less across its layers, so grade, machine, build direction and test method all belong in the order.

TPU Powder Grades and Their Tensile Properties in XY and ZFour makers' sheets give enough to compare. Forward AM, the additive business of BASF, publishes four Ultrasint TPU powders side by side in one brochure, which makes it the cleanest set: the same company, the same tests, four grades.

Inspecting a 3D Printed Production Run and When a Mold Takes Over

Accept the first printed part against written limits, keep the record, and weigh a mold by identical quantity and design stability.

How a Printed Production Run Is Inspected and AcceptedISO/ASTM 52901:2017, titled requirements for purchased AM parts, gives the frame. Its scope says it covers the elements to be exchanged between customer and part provider at the time of the order: customer order information, part definition data, feedstock requirements, final part characteristics and properties, inspection requirements and part acceptance methods.

How Long a Batch of 3D Printed Parts Takes From Print to Pack-Out

A printed batch runs on four clocks, build, cooldown, finishing and inspection, and a stated lead time should show each.

Lead Time for a 3D Printed Batch Stage by StageThe calendar of a batch has the same skeleton in every process. Files are prepared and nested, the machine builds, the work cools or cures, parts are separated from what held them, and finishing and inspection follow.

SLA Wash and Post-Cure Step by Step From Green Part to Finished Resin Part

Wash each resin for its own time, dry it fully, cure to the datasheet condition, then remove supports and measure.

SLA Wash, Dry, Cure and Support Removal in OrderThe part leaves the printer in a green state: polymerized enough to keep its shape, but with its reaction unfinished and a film of liquid resin over it. The order in which the finishing steps run is set by what each one needs from the one before.

Metal 3D Printing Stress Relief and Build Plate Removal Step by Step

Stress relieve metal parts on the plate, then cut, remove supports, anneal if needed and measure after the heat.

Metal Powder Bed Fusion Post-Build Steps in OrderThe post-build sequence for a part built on a plate has a stable shape across machine makers, because the stresses behave the same way. The sources agree on the order; they differ in how much of the detail they publish.

SLA Dimensional Tolerance by Feature Size

SLA tolerance is published as a percentage of feature size with a small floor, so a drawing writes bands and a post-cure condition and not one general figure.

SLA Tolerance Values Published by Two MakersTable 1 states the two specifications as their makers print them. Neither is a guarantee for a delivered part, and the Formlabs guide notes that the best way to judge a printer is to inspect real parts.

ISO/ASTM 52901 Requirements for Purchased Additive Manufactured Parts

The purchased parts standard lists what an additive parts order carries, from tolerances and feedstock to three acceptance stages, and leaves every value to the buyer.

What ISO/ASTM 52901 Asks a Buyer and a Supplier to ExchangeThe scope has three sentences and each one shapes how the standard is used. The first says the document defines and specifies requirements for purchased parts made by additive manufacturing.

Send the 3D File of Your Printed Part

Send the 2D drawing and the 3D file, with the quantity and the stage of the project. An engineer replies within 1 working day.

The quote form, the mutual NDA and the private folder for your files are on Protolis Atelier, with 3D Printing chosen.

Request a Quote