DrawingHeat TreatmentLayer Thickness

Metal 3D Printing Stress Relief and Build Plate Removal Step by Step

Stress relieve metal parts on the plate, then cut, remove supports, anneal if needed and measure after the heat.

Metal 3D printed stainless steel parts still standing on a thick steel build plate on thin support structures, matte grey.

EOS asks for a stress relief on its 316L stainless steel of at least 2 hours at 900 °C (1,652 °F) when the part is thoroughly heated, followed by a quench fast enough to stop chromium carbides forming. A cantilever printed in titanium shows why the step comes before the saw: cut free of its plate unrelieved, it bends in the plane of its length, because the top of the beam carries tension and the bottom carries compression, locked in layer by layer during the build.

Laser powder bed fusion welds metal one thin layer at a time, and each melt pool cools quickly against a solid that is already contracting. The part leaves the machine fixed to a thick plate, which holds those stresses in place. What happens between the end of the build and a part that can be measured is a sequence of heat, saw, hand work and inspection, and the order of that sequence is set by what the plate is doing.

Metal Powder Bed Fusion Post-Build Steps in Order

The post-build sequence for a part built on a plate has a stable shape across machine makers, because the stresses behave the same way. The sources agree on the order; they differ in how much of the detail they publish.

Table 1. The post-build sequence for laser powder bed fusion metal parts and the condition attached to each step
Step Operation Condition and figure Source
1 Stress relief, part still on the plate typically before the part is removed from the plate De Baere et al., Additive Manufacturing 38
2 Cut the part from the plate bandsaw or wire-eroding machine MakerVerse guide
3 Remove supports by hand, with hammer, chisel, tongs or grinders MakerVerse guide
4 Grind the support contact surfaces rough where each support attached MakerVerse guide
5 Further heat treatment where properties call for it EOS 316L solution annealing at 1,150 °C (2,102 °F) for at least 1.5 h EOS 316L data sheet
6 Media blast corundum, on every part in that supplier’s flow MakerVerse guide
7 Machine critical features, if drawn needs a drawing of the machined faces MakerVerse guide
8 Inspect optical 3D scan, tactile CMM, stylus roughness, CT for internal flaws MakerVerse guide

Steps 1 and 5 are heat treatments with different jobs. The first lowers the residual stress so that cutting will not move the part. The second changes the microstructure to reach the properties the application needs. A supplier who offers only one of them has chosen which job to do, and the buyer should know which.

The plate is a fixture. Heat first, saw second, and the part leaves the plate in the shape it was built in.

Why Parts Are Heat Treated Before They Are Cut Free

The 2021 paper by De Baere and co-authors from the Technical University of Denmark, KU Leuven and 3D Systems Leuven puts the habit in one sentence: a part made by laser powder bed fusion is typically heat treated before it is removed from the build plate. The reason is in their cantilever. The beam bends in the plane of its length after release from the plate, because the tensile residual stress at the top and the compressive stress at the bottom come out of balance once the plate stops resisting.

Heating the part relaxes the stress through two mechanisms the paper names. Raising the temperature lowers the yield strength, so the stress relaxes by plastic yielding. At higher temperatures a second mechanism, creep, adds a time-dependent reduction. The same drop in tensile stress at the surface also raises the toughness of the part.

The paper collects earlier measurements. A stress-relief treatment just below 600 °C (1,112 °F) reduced deformation from residual stress by 80 percent in one study. Neutron diffraction at 600 °C and 700 °C (1,292 °F) showed the majority of the stress gone in the first ten minutes and the stress down to a few percent after two hours, with about 90 percent gone at 600 °C after 100 minutes. A study across 427 °C to 610 °C and dwell times from 5 minutes to 30 hours found that the stresses fall quickly at first, and that some remain even at 610 °C after 30 hours. All of these are for the alloys named in those studies, mostly titanium and a stainless steel at 700 °C, and the published figures differ by source, a point the authors make themselves.

Table 2. Stress relief measurements collected in De Baere et al. (2021), by temperature and time
Temperature Dwell time Result reported
just below 600 °C (1,112 °F) not stated in the paper deformation from residual stress reduced by 80 percent
600 °C and 700 °C first 10 min majority of the stress relieved
600 °C 100 min about 90 percent of the stress relieved
600 °C and 700 °C 2 h stress down to a few percent
610 °C (1,130 °F) 30 h some residual stress remains

What Temperature and Time Trade Against Each Other

The paper’s own model uses a titanium alloy cantilever and plots displacement against dwell time for several temperatures. A hotter treatment relaxes the stress faster, and the authors note a process window in which the deflection after treatment is minimal. In their simulations, long holds above 750 °C stop reducing the tip deflection and increase it, because the stress redistributes and the deflection is then driven by the support rather than the beam, a result the authors say can be mistaken for incomplete relaxation. The lesson for a buyer is that time and temperature are chosen together for a given alloy and geometry, not set once for every part.

More heat does not always mean less distortion. The treatment is set for the alloy, the geometry and the supports, and a supplier should be able to say how.

The EOS 316L Figures for Heat Treatment and Build

The data sheets from a machine maker give the most specific numbers for one material. For EOS StainlessSteel 316L on the EOS M 290, the powder has a particle size distribution of 20 to 65 µm, and the data sheet lists two heat treatments.

Table 3. EOS StainlessSteel 316L heat treatment and build figures on the EOS M 290
Item Value Source
Stress relieve 900 °C (1,652 °F), at least 2 h when thoroughly heated, water or high-speed gas quench EOS 316L data sheet
Solution annealing 1,150 °C (2,102 °F), at least 1.5 h when thoroughly heated, water or high-speed gas quench EOS 316L data sheet
Quench requirement fast enough to prevent chromium carbide precipitation EOS 316L data sheet
Typical dimensional change after heat treatment +0.02 percent EOS process data sheet, 40 µm
Layer thickness and volume rate 40 µm at 3.7 mm3/s; 20 µm at 2.0 mm3/s EOS process data sheets
Minimum wall thickness at 20 µm 0.3 to 0.4 mm (0.012 to 0.016 in) EOS process data sheet, 20 µm
Build volume 250 × 250 × 325 mm (9.8 × 9.8 × 12.8 in) EOS M 290 brochure

The dimensional change of +0.02 percent after heat treatment is a small number, and it is a typical value from EOS’s own testing, so a part with a tight tolerance should still be measured after the treatment, not before. On a 100 mm (3.9 in) dimension 0.02 percent is 0.02 mm (0.0008 in). The mechanical properties as manufactured differ by direction: for the 40 µm set, EOS lists a vertical yield strength of 490 MPa and a horizontal one of 560 MPa, with tensile strengths of 600 and 690 MPa and elongation of 55 and 40 percent. A drawing for a loaded part can say which way the load runs relative to the build.

Cutting the Plate and Taking Supports Away

MakerVerse’s post-processing guide says complex components are cut from the build plate, typically with a bandsaw or a wire-eroding machine, and that this is always needed for parts with printed supports. The supports then come off by hand, using hammers, chisels, tongs or grinders, which the guide calls time-consuming and labor-intensive. The areas where supports attached are rough and are smoothed by hand.

Support removal is therefore both a cost and a source of variation. Each support contact is a place where a tool can mark or move a thin feature. The sources do not give a time per support or a roughness figure for the contact faces, so a buyer who needs either should ask the supplier for measured values from its own parts, with the measurement method named.

The same guide treats the heat treatment as optional but recommended: printing induces internal stress, which can cause deviations or, in the worst case, part failure, and the treatment can come at completion or before other post-processing. The guide gives no temperatures. Where a drawing calls for high strength and low elongation, such as a tool steel part, the guide says the treatment is needed.

Where the Plate Itself Fits

The plate is part of the process, not an afterthought. It is the thing that carries heat out of the first layers, and it stays bolted to the part through the heat treatment in the order above. For that reason a supplier’s quotation for a metal part should show the plate step as a named operation, with its method, rather than leaving it inside a lump called finishing.

How Long the Build Takes Before Any of This Starts

The heat treatment and the saw come after a build whose length the machine maker also publishes. EOS gives a volume rate for each parameter set: 3.7 mm3/s for 316L at 40 µm and 8.4 mm3/s at 80 µm, with the note that the rate depends on part dimensions and skin thickness. The 20 µm set is 2.0 mm3/s. The M 290 carries a 400 W fiber laser and runs under argon or nitrogen, and its monitoring records laser power across the build and images the powder bed after each recoat and exposure.

The volume rate converts to time by plain division. At 3.7 mm3/s, one cubic centimeter of solid (1,000 mm3) takes about 270 seconds of exposure, so a 100 cm3 part needs roughly 7.5 hours of exposure at 40 µm and about 3.3 hours at 80 µm. This is arithmetic from the published rates, it leaves out recoating time and the plate’s warm-up, and the sheet’s own caveat about part dimensions applies, so it sizes a build rather than predicting one.

Two consequences matter for a plan. The thicker layer option shortens the build at a cost to the fine detail that the 40 µm set is described as giving, and the maker says the 40/80 µm skin option can cut total build time at the same surface quality by assigning layer thickness to different regions of the part. And the heat treatment adds its own hours to the calendar: at least 2 hours at 900 °C for the stress relief alone, before the furnace’s heating and cooling time, which the data sheet does not state.

What Goes Wrong Between the Build and the Part

The failures in this sequence are mostly dimensional, and they are seen on a measuring machine.

  • A part that is out of flat by an amount larger than the drawing allows after it is cut from the plate: stress that was not relieved first.
  • A stainless part whose corrosion resistance or properties are off: a quench slower than the data sheet’s requirement, which allows chromium carbides to form.
  • A thin feature that moved or marked when its support was pulled: EOS gives 0.3 to 0.4 mm (0.012 to 0.016 in) as the minimum wall at 20 µm, and a wall near that size has little margin against a chisel.
  • Properties that differ from the data sheet by direction: loads along the build axis against loads across it, where EOS’s own figures differ by 70 MPa in yield strength.

MakerVerse names four inspection methods for metal parts.

  • Optical 3D scan, the fastest, which compares overall form against the model.
  • Tactile CMM, slower and more precise, for datum and feature dimensions.
  • Stylus measurement of surface roughness.
  • Computed tomography, which finds internal pores, inclusions and voids.

EOS’s process data sheet reports defect percentage and density by sample count: 0.018 percent average defects across 45 samples and a density of at least 7.97 g/cm3 for the 20 µm set. The figures are statistics of EOS’s own validation builds, and EOS notes that tolerance intervals are based on validation data and are not directly transferable to other systems.

What to Write Into an Order for a Metal Printed Part

ISO/ASTM 52901:2017 sets out what a buyer and a part provider exchange at the time of the order: the part definition and geometry, tolerances, surface texture, the manufacturing process, the feedstock, repair methods, acceptable imperfections, process control information and authorized outside service providers, then characteristics, inspection and post-processing, then acceptance. Each item of the sequence in Table 1 has a place.

  • Heat treatment before plate removal, with the method named rather than the temperature alone.
  • The cutting method, saw or wire erosion.
  • The support removal method and which faces may carry marks.
  • The inspection method for each critical dimension, and when it is made, before or after heat treatment.
  • Acceptance of a first production part before the run, since the standard has a clause for it.

An order that names those five items is the one that gets a part that holds its shape from the plate to the gauge, and it is the order a buyer of low-volume 3D printing should place when the same metal part will repeat in bridge production.

Sources and Further Reading

Send the 3D File of Your Printed Part

Send the 2D drawing and the 3D file, with the quantity and the stage of the project. An engineer replies within 1 working day.

The quote form, the mutual NDA and the private folder for your files are on Protolis Atelier, with 3D Printing chosen.

Request a Quote